Valdejudíos Creek Bridge, Madrid


Term of execution: 2 MonthsStatus of work: Finished

Desarrolla has successfully carried out the assembly of the bridge over Valdejudíos’ stream, located in the village of Talamanca del Jarama, Madrid.

This work is the solution to the neighboring need of road communication in the historic centre of the village. The trace of the stream at Valdejudíos, belonging to the Tajo Hydrographical Confederation, prevented the access during the rainy months to the Visigothic wall of the village, located in the upper part, due to the high flow flooding collected throughout its basin. Likewise, this difficulty was also manifested in the agricultural traffic to the arable land surrounding the village.