Service Blocks in Algeciras Bay Port
Term of execution: 3.5 MonthsStatus of work: Finished
The UTE formed by the construction company Desarrolla and Podimar electronic engineering company, have done the works of “Block Installation Project Services Supply of Electricity and Water of Boats, Boat Auxiliary Dock in the Port of Algeciras”.
The works have consisted in the installation of 28 prefabricated blocks of supply of water and electricity to ships, the adaptation and upgrade of the electrical, hydraulic and telecommunication existed installations.
The works have been done within three months and a half, been finished before the “Operation Pass of the Strait” (OPE) which is develop in the Dock of Auxiliary Ships.