Comprehensive works in A Coruña Port Authority office building


22 January, 2020

The project included the urbanization of the surrounding area

We have completed the works of A Coruña Port Authority office building, from the excavation of the foundation to the interior finishes. We also accomplished the urbanization of the surrounding areas.

The action interfered with the access to the San Diego quay, it included the construction of a two-story building with a trapezoidal floor and a flat roof with a perimeter roof that will allow maintenance work on the machinery installed in that area without danger of fall in height.
The building lacks architectural barriers. The exterior carpentry is made of aluminum with glass with heat treatment and solar control. As for the finishes, the pavements vary depending on room usage, from porcelain in the offices to a non-slip vinyl in the changing rooms, through polished concrete in the storage area.

The works also included the urbanization of the surrounding areas with the execution of all sanitation, telecommunications and electrical connection services. It was also completed with the installation of terrazzo tile sidewalks and concrete curb and lighting using vertical mast lampposts and LED luminaires.